Live Market
DANGOTE CEMENT (50KG) MARKET
13,450.000.15
LAFARGE CEMENT (50KG)
13,200.000.10
Hollow Concrete Blocks (6")
700.000.10
Hollow Concrete Blocks (9")
1,121.690.10
Partition Blocks (5")
650.950.10
Solid Concrete Blocks (6")
927.510.10
Solid Concrete Blocks (9")
1,433.870.10
Interlocking Blocks
702.240.10
DANGOTE CEMENT (50KG) MARKET
13,450.000.15
LAFARGE CEMENT (50KG)
13,200.000.10
Hollow Concrete Blocks (6")
700.000.10
Hollow Concrete Blocks (9")
1,121.690.10
Partition Blocks (5")
650.950.10
Solid Concrete Blocks (6")
927.510.10
Solid Concrete Blocks (9")
1,433.870.10
Interlocking Blocks
702.240.10
DANGOTE CEMENT (50KG) MARKET
13,450.000.15
LAFARGE CEMENT (50KG)
13,200.000.10
Hollow Concrete Blocks (6")
700.000.10
Hollow Concrete Blocks (9")
1,121.690.10
Partition Blocks (5")
650.950.10
Solid Concrete Blocks (6")
927.510.10
Solid Concrete Blocks (9")
1,433.870.10
Interlocking Blocks
702.240.10
DANGOTE CEMENT (50KG) MARKET
13,450.000.15
LAFARGE CEMENT (50KG)
13,200.000.10
Hollow Concrete Blocks (6")
700.000.10
Hollow Concrete Blocks (9")
1,121.690.10
Partition Blocks (5")
650.950.10
Solid Concrete Blocks (6")
927.510.10
Solid Concrete Blocks (9")
1,433.870.10
Interlocking Blocks
702.240.10

Vetted Supply
For Contractors.

Reconstruct your procurement pipelines. Get automated 4-hour drop casting cycles and active site logistics oversight under one centralized ledger.

Blucindustry Contractors System Portal

Logistical Infrastructure

Engineered to guarantee continuous material feeds to Owerri, Lagos, and Abuja's largest sites.

Compliance: Passed

Verified Strength Assurance

Every batch of blocks we produce stands up to 20MPa of load capacity. We provide downloadable mechanical laboratory certificates.

Logistics: 4 Hours

Continuous Drops

Set your masonry schedule. We dispatch loaded flatbeds at precise 4-hour intervals to ensure active gate clearances.

Logistics: 4 Hours

Billing: Paystack

Consolidated Invoices

Audit multiple active projects seamlessly. Split bills across site cost-centers and generate standard corporate tax invoices.

Billing: Paystack Secure

Allocation: 24/7

Dedicated Site Representatives

Every contractor account is allocated a certified engineering representative to review site entrance gates and drawings.

Scale your building capabilities.

Get corporate priority flatbed clearance, dedicated factory quotas, and a personal structural manager.